Tanzania 200t/d Rock Gold CIL Production Line

In Tanzania, a country rich in gold resources in Africa, a rock gold mine (oxide ore) project with a daily processing capacity of 200 tons has been put into production efficiently with the advanced CIL (carbon-in-leach) process, with a gold recovery rate exceeding 92%, becoming a model for oxide ore development in East Africa. This article will deeply analyze the process flow, technical highlights and operating results of the project.

Tanzania 200t/d Rock Gold CIL Production Line

1. Project Background

The mining area is located in the gold mineralization belt of Tanzania, where the ore is mainly oxidized and the gold deposit is complex, with high mud content and a small amount of accompanying sulfides. Customer requirements:

2. Process Design

CIL method as the core, customized gold extraction plan for ore characteristics, using "crushing-grinding-leaching-adsorption-desorption-electrolysis" full process CIL process to achieve efficient gold recovery:

Crushing and screening system

Grinding and classification system

CIL leaching and adsorption system

Desorption electrolysis and smelting

Tanzania Gold CIL Processing Plant

3. Technical Highlights

Efficient pretreatment process

Energy-saving and consumption-reducing design

Intelligent control system

4. Environmental Protection and Sustainability

With its high process adaptability and fast return on investment, the CIL production line provides a replicable solution for the development of similar oxide ores in Tanzania and Africa. We provide "one-stop service" from mineral processing tests, engineering design to operational support to help global customers dig gold in Africa.

Related Blogs

Customize Your Own Crushing Plant Now

Fill your requirements here, and we'll send the custmized solution and quotation to you by the reserved contact information.

*
*
* WhatsApp
*
X