Project Background


The customer is the leading steel corporation in India and one of TOP 10 steel companies over the world. This time, the company bought 3 sets of MTW138 European Grinding Mills from ZENITH to grind limestone to produce desulfurization powder.They raised strict demands on whole process of project including the investigation, supervision, construction and service. Meanwhile the project period was quite short.The construction of production line encountered the rainy season. Terrible weather condition challenged the construction…

Project Advantages


Strict supervision on each stage. From initial inquiry, factory visit, business negotiation to product check, installation and commissioning, we coordinated with the customer and finished the project by meeting all standards.

To keep conveying capability, we recalculated the volume and pressure of wind and decided to use stronger fan. Meanwhile, we upgraded the tube, dust collecting system and pressure system to increase the efficiency.

A project management team was established to supervise the progress of the whole project. By coordinating local resources, the communication was promoted on both technologies and affection.

Considerate project service. Our technical engineers designed reasonable technical drawings, solved every technological difficulty and explained project details for the customer.

Customer Evaluation


1. We have ever bought machines from Germany, America and India. This cooperation impressed us a lot. After cooperating with ZENITH, we found that Chinese machines are not worse than those of developed countries.
2. From the quick response of initial inquiry to later sales service, ZENITH always considered for us whole-heartedly. During the installation of equipment, the engineers and the staff in India overseas office stayed at our production line for instruction. Their serious attitude moved us a lot.
3. The most important thing was that the power plants expressed satisfaction to our desulfurization agent. The fineness was controlled well. The controlling system taking international standards made our operation easier. Currently, we are negotiating other grinding projects and hope we can enter business relationship with ZENITH again.

Video Center

Customer Cases


India 30TPH Limestone Grinding Line

Location:India
Material:Limestone
Input Size:Below 12mm
Output Size:74μm (200mesh) D90
Capacity:30t/h


Vietnam 15TPH Coal Grinding Line

Location:Vietnam
Material:Coal
Capacity:15t/h
Application: Supplied for local lime kilns


Mexico 5TPH Clay Grinding Line

Location:Sinaloa, Mexico
Material:Clay
Output Size:250-325mesh
Capacity:4-5t/h


Belgium 5TPH Limestone Grinding Line

Location:Belgium
Material:Limestone
Output Size:150mesh D90
Capacity:3-5t/h


Thailand 8TPH Dolomite Grinding Line

Location:Thailand
Material:Dolomite
Output Size:100mesh (D90), 325mesh (D10)
Capacity:8t/h


15TPH Coal Grinding Line

Location:Zhejiang, China
Material:Coal
Input Size: 0-35mm
Output Size:250-325mesh
Capacity:15TPH


Request A Quotation


PLS fill the form carefully, so that we can draft the solution and quote the price to you quickly.